Plumbing & Heating

When purchased there was a partial CH/hot water system heated by the oil-fired  Stanley range in the kitchen, and  which supplied 4 radiators upstairs and one in the downstairs hall. It also  heated a very small "thermic" HW tank with integral cold feed tank located in the main bedroom. This system was eventually replaced with a conventional  central heating  system with a separate oil-fired boiler located in the utility room. Additionally, by installing a hot water tank fitted with two heating coils,  hot water could be heated either by a pumped circuit from the CH system or by a  gravity gravity heating circuit to the AGA. A 50 gallon cold water tank was installed in the loft, together with header tanks for the pumped CH  and gravity AGA system.  A pumped shower system feeding the master bedroom ensuite and guest shower room  was installed. New bath suite fitted in bathroom including  whirlpool bath.













Original hot water tank, I'm told this size is normally installed in small flats.


Start of plumbing to guest ensuite- A prize if anyone can explain what all six pipes are for.


Final stage, plumbing extended to include master bedroom ensuite. Black wiring is TV feeds.

Upstairs pipework, viewed from below


All my own work -and it shows (one day I must tidy up the wires)


Plumbing's not just messing about with copper pipes - sometimes you get to lay new drains from the cesspit!