Start breaking up old concrete
Ready to be shovelled into front end loader and then lifted into trailer
Concrete arrives
Dug out to a depth of about 4 inches.
Bit more than I thought!
Laid (with the help of Chris).
The original yard in front of the house was concrete laid in a number of approx 3 x 4 metre concrete pads. Over the years some pads had become cracked and a few were breaking up badly. So one day I decided to dig up the worst of the pads and reconcrete it. Ion the back of my mind was the idea that I could perhaps do say a couple a year until the whole yard was done. The experience with just one pad convinced me that this was a BAD idea!
Concrete arrives
Dug out to a depth of about 4 inches.
Laid (with the help of Chris).